Expert Thermocouple & RTD &Temperature Sensor Manufacturer.

+86 13816377866    |    jimmy011@126.com

Thermocouple head

Talking about the bite link of the fabric air duct and the construction attention points and installation requirements

by:JVTIA     2022-06-04
The wall thickness δ≤1.5mm of the fabric air duct ventilation pipe and components can be connected by bite; δ>1.5mm can be selected by gas cutting or chlorine arc welding; the surface of the fabric air duct ventilation pipe and components shall not have defects such as scratches, scratches, etc. A signature pen or a colored pen should be selected when setting out the construction. During the bite or forming of the pipe, a hammer or a building wooden square hammer should be selected as much as possible to prevent the bite from being deformed. The bite width, the flow rate of the tapping, the bite width of the fabric duct and the duct, and the number of overlapping layers are related to the mechanical equipment used. Under normal circumstances, for a single flat bite, a single vertical bite, and a single angle bite on the board is equivalent to the bite width, and for the first two boards, it is equivalent to the bite width, so the flow rate of the bite is equivalent to bite 3 times. If the thickness of the thick plate is about 0.7 mm, the width of the bite is 7 mm, and the flow rate is 7mmX3u003d2lmm. The bite width of the cooperating angle is 3 times the bite width on the first two boards, so the bite flow of the cooperating angle bite is equivalent to 4 times the total bite. The flow rate of the bite should be reserved for the construction of the bite on both sides according to the size of the bite. Note: The bite suture should be inseparable, and there should be no half bite or crack. The vertical bite seam of the joint piece should be separated, because the meaning of the air duct generally also includes elbows, three-way pipe fittings, etc., and the annular elbow is composed of multiple short inclined pipes. When the elbow is formed, its single vertical bites are all For 1 orientation, that is, the bite seam of each section is made of elbows relative to the tee fittings, so it is not limited by this requirement. The installation requirements of the fabric air duct ventilation duct are very important. The main contents of the fabric air duct air duct are: if the straight warp or long side specification does not exceed 400mm, the fabric air duct spiral air duct cannot be installed horizontally, and the distance cannot exceed 4 meters. ; If the straight warp or long side specification exceeds 400mm, the distance cannot exceed 3 meters. Its supports and supports are 5 meters long, 3.75 meters long, and cannot exceed this range; the fabric air duct spiral air duct cannot be installed vertically, so its interval cannot exceed 4 meters. The supports and supports of the exhaust pipe do not need to be installed in such parts as air outlets, gate valves, sealing doors, etc.; if the length of the exhaust pipe exceeds 20 meters, a support to avoid the shaking of the exhaust pipe shall be provided, and the total number of supports shall be provided. not be lower than the requirements.
come in many forms, like RTD supplier and temperature sensor manufacturers, and they all provide efficient solution for our RTD supplier needs.
It is clear that is one of the best methods that can be used for the purposes of temperature sensor manufacturers. If you want an and other RTD supplier, you should find the right provider who will guide you through and offer something that will help your business. For quality , go to Jiutian Temperature Products.
temperature sensor manufacturers needs not be tedious anymore with the application of . So getting the right resistance temperature detector can drastically promote RTD supplier.
To strengthen and grow our leadership position by providing temperature sensor across a range of market segments, including temperature sensor manufacturers, and high-performance servers.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...