Expert Thermocouple & RTD &Temperature Sensor Manufacturer.

+86 13816377866    |    jimmy011@126.com

Where is the special distribution of fiber duct systems

by:JVTIA     2022-03-06
Ducts should only be installed after the engineering works and all other equipment installations have been completed and the site is clean, especially when sand, paint, polish and engineering debris have been removed. It is good to install after the room has been cleaned. During the installation process, make sure that the workers' hands and installation tools are clean. At the same time, please keep all tools and equipment that will come into contact with the system piping clean to ensure that the installed piping can have a good appearance. The fiber air duct is extremely easy to install due to its special polyester fiber material characteristics. After installing the corresponding hanging wire or slide rail, the installation of the system is as simple as hanging curtains. Corresponding to the project installation cycle, the installation cycle of the traditional wind system can save 90% of the time. For projects that are in a hurry, it can obviously reflect the advantages of convenient installation. On-site investigation and measurement of the upper and lower heights and diameters of the air outlets of each iron sheet air duct to determine the specific length of the system. Use design drawings for reference. Install all brackets securely. It is required that the front and rear brackets of the same pipe are installed in parallel, symmetrical, and without offset. Wire rope production Rope head production, rope length estimation (the length should be slightly longer than the actual required length, the difference between the length after truncation and the actual required size length is ≤ 0.5m) The wire rope is the installation of the hanging system. The turnbuckle bolts should be long enough to adjust the straightness of the wire rope when the system is loaded. Determination of the number of 2mm wire rope hangers and installation positioning: When the hanging height between the wire rope and the top is greater than 1.6m, use a 2mm wire rope hanger. The number of quick hangers can be calculated according to about 7m. When the quick hanger is installed, the fixed point on the top plate should be on the same vertical plane as the steel wire. The 2mm wire rope hanger is made on site (cut the appropriate length of 2mm wire rope and fix each end with a clamp). Pipe section hanging pipe installation: hang the hook of the pipe on the steel rope in the order of the pipe number, and pull the zipper between the pipes and the end zipper to the entrance. Installation: cover the entrance, install the cable tie, and riveting and riveting according to the spacing of each rivet 15~ Install about 30cm. When installing the inlet, the zipper between the pipe and the pipe is required to be pulled up to align with the installation angle of the inlet (the angle of the inlet is not correct, which will cause the pipe at the inlet to be twisted and wrinkled). Tighten the turnbuckle bolts so that the rope is straight. Straighten the hook at the end of the tube and fasten it to the wire with the clip.
Shanghai Jiutian Automation Equipment Co., Ltd is famous for creating innovative products like the resistance temperature detector and supporting their market leadership with savvy marketing campaigns to build an elite brand.
We are proud to be one of the largest suppliers out there. You will love what we offer for your temperature sensor solution. Check our website at Jiutian Temperature Products or call to talk to our customer service department with any questions you may have.
With innovative technology, our professionals can spend more time focused on strategies that will improve resistance temperature detector’s quality and deliver a more positive customers experience.
You will have a RTD supplier that looks temperature sensor manufacturers all the time, Because your is handling with it.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...