loading

Expert Thermocouple & RTD &Temperature Sensor Manufacturer.

Armoured thermocouple in the heating furnace of ketone benzene dewaxing unit of technological transformation1

Pick to: this paper introduces the armoured thermocouple in the heating furnace of ketone benzene dewaxing unit of lanzhou petrochemical company and supporting facilities of some of the technical modification and optimization measures, through technical modification, increases the thermal efficiency of heating furnace from the original 80% to more than 91% now, thermal efficiency is improved, close to the design level. Energy consumption reduced year by year, the energy conservation and emissions reduction, and overall technical and economic indicators have improved, improve the economic benefits of the device.

1 device status quo analysis before renovation, a set of ketone benzene device actually have two electric heating furnace. One of them is to wax oil, wax material provide heat source, workshop called & other; A batch of dual-use & throughout; , radiation section with partition, four 5 of the space is used for heating to wax oil, the other one 5 of the space used for heating of wax material, due to the feed rate of heating furnace, the requirements of the furnace temperature is different, the deviation is very big, although there is a wall, but to the radiation section of the upper and become one, See figure 1) 。 Still influence each other in the operation process, the furnace outlet temperature is difficult to control, the tremendous difficulty to the operating personnel. Another one under the wax oil only provide heat source, the operation is relatively simple, relatively stable operation [ 1 - 3] 。 Because two used in heating furnace, furnace body deformation, the lining drop and several air leakage, the surface of the furnace temperature is high, the furnace heat loss is big, the flue damper control using hand to adjust, and no waste heat recovery system, so the thermal efficiency is extremely low, before modification, furnace 1 highest thermal efficiency is 84%, the lowest thermal efficiency is 76%, furnace 2 highest thermal efficiency is 85%, the lowest thermal efficiency is 78% ( See table 1) 。 Become the energy-consuming equipment. High exhaust temperature, smoke large displacement, high concentration of NO x in flue gas, and energy conservation, environmental protection equipment.

2

2. 1 the flame monitor to monitor

20 of the original design was three sets of furnace burner are installed flame monitor, once there is a fire mouth out, signal feedback to the furnace fuel gas rapid cut-off valve, the valve is closed, the heating mouth all put out the fire, to prevent tempering or steam chamber of a stove or furnace. Heating furnace after flameout, device to cut off incoming, retreat to the relative safety state, after being relighting it again to resume production, large losses for device. In addition, a flame monitor the price is in 10000 yuan of above, the cost is higher, in the case of a shortage of funds, the suggestion on each heater installed in radiation section, a flame monitor all camera at the bottom of the furnace burner and the lower part of furnace tube, the signal is introduced into the operation on a television monitor, operators can completely observe and monitor each burner combustion conditions. Disposal if abnormal case, can quickly respond, safety can be ensured and the whole furnace monitoring operation, save the installation and maintenance costs.

2。 2 instead of furnace outlet temperature thermocouple sheathed thermocouples

the original design three sets of furnace outlet temperature of the two way two thermocouples, total export 1 measuring thermocouple, one control thermocouple, a total of 12 units are common thermocouple, considering the furnace outlet temperature is higher, up to 270 ℃, medium inflammable and explosive components of methyl ethyl ketone, toluene, once has the leakage, can cause a fire. Advice with armoured thermocouple, after the case is not easy to leak, to prevent the leakage problem.

2。 3 burner and shift of pilot burner gas double valve group modified

to ensure furnace ignition reliable valve tightly, before the fire mouth and is equipped with double valve pilot burner fuel gas. But now found in the construction of gas flow loop under two valve installed too close. Practice is not convenient, it is recommended that a valve should be installed under the gas flow loop, two way valve installed in a location near the burner, so when the normal operation of a valve normally open, two way valve with the working condition of timely adjust, convenient to operate.

2。

4 upgrade replacement of air duct control box mainboard three heating furnace for the wind system equipped with air duct valve, pneumatic motor, a control box and often occurs in the process of running in the DCS can't operation, and the opening of the valve position is a table and DCS display value deviation is large, confirmed by the analysis of the main board version is low, frequent breakdowns, after the motherboard upgrade replacement, solved the problem.

2。 5 induced draft fan site cannot be started after cut cut or stop

induced draft fan motor frequency control, after the cut cut or stop induced draft fan for many times, found that cannot be started, can only be started after the transformer room reset, confirmed by the analysis of the electrical control cabinet no potentiometer, need not reset after add potentiometer, you are able to operate the induced draft fan motor at the scene.

2。 6 for operating experience and revision in the operating instructions before

no heating furnace waste heat recovery system, the modified installed thermocouple and flue gas waste heat recovery system, the operator is trained, but there is still a flue gas oxygen content in the process of operation, hearth negative pressure, outlet temperature of the furnace, such as volatility, not accurate operation, after a period of groping, write the operation instruction, after is feasible by practice, the operation method of revision in the operating instructions.

2。

7 after transforming effect after reforming furnace thermal efficiency increase year by year, obvious effect, close to the design value ( See figure 2) 。

3 conclusions and improve supporting facilities of the thermocouple by furnace, heating furnace thermal efficiency increased significantly, from 80% to more than 91% now, close to the design value, waste heat recovery system can run for a long period of time, the overall smooth operation of reheating furnace, the energy consumption of unit, the unit mass transfer efficiency purpose. Relevant product recommendations: magnetic level gauge

GET IN TOUCH WITH Us
recommended articles
NEWS
At present, more and more customers on the market are just beginning to attach great importance to the hidden dangers of the application of air disc machines and equipment.
Ventilation duct manufacturers talk about three welding methods for fabric ducts: Method 1: Manual welding.
It should be erected by the scaffolder according to the special safety construction organization design (construction plan) or safety technical measures.
Compliance Standards and Common Problems in Ventilation Duct Equipment Many bosses generally ignore the smoke exhaust system and natural ventilation planning of the restaurant kitchen when they open a new restaurant, which eventually leads to the closure of the hotel for renovation, renovation or sale of serious losses.
Ventilation pipe ventilation pipe manufacturer is a hollow pipe used for ventilation.
When we want to enter an industry and decide to dedicate our light and heat, our calm choice is to analyze this market well.
How to ensure the construction quality of dust removal fabric duct ventilation duct? In order to promote the construction of dust-removing fabric duct ventilation ducts, we should formulate some drastic measures.
How does the ventilation duct manufacturer ensure the construction quality of the ventilation duct for the dust removal fabric duct? 1.
There are common pipes everywhere in daily life, and it is not clear what to do.
Ventilation ducts are metal or composite ducts for ventilation in industrial and civil buildings.
no data

CONTACT DETAILS

Phone: +86 13816377866
Email: jimmy011@126.com
Add:NO999, Sunqiao RD, Pudong area, Shanghai, China
 

CONTACT US FOR FREE SAMPLE !

For more products related question ,Welcome to inquiry us .

Copyright © 2019 Shanghai Jiutian Automation Equipment Co., Ltd. | Sitemap
Customer service
detect