(4) when measuring the original insertion depth of more than 1 m, shall be installed vertically, as far as possible or add racks and protect casing.
CONTACT DETAILS
Phone: +86 13816377866
Email: jimmy011@126.com
Add:NO999, Sunqiao RD, Pudong area, Shanghai, China