Large heating equipment and piping components is often used to large engineering project, such as oil, gas, etc. , to connect more industrial equipment components, therefore, it plays the essential role. Usually, in order to control the actual usage of plumbing, we usually some pipe on the pipe plug thermometer ( The surface thermometer) , monitoring of pipeline's actual thermometer, ensure the normal running of it. How to install the thermometer is to have cultured in the pipeline, pipeline the installation position of the thermometer should fall in the medium temperature sensitive and representative place, don't choose the near the valve components such as resistance and flow of medium beam in a corner and the place of vibration is larger. A, and process piping installation, vertical pipeline center line of the thermometer should be fellowship with piping vertical axis. Second, in the corner of process piping installation, should be against the medium flow, pipe center line of the thermometer should coincide with the center line of the process piping. Third, with the process piping 45 & deg; Oblique installation, should be against the medium flow direction, pipeline centerline thermometer should be fellowship with the center line of the process piping. On the pipeline installation temperature time, should consider to take out the space required for the pipeline thermometer ( Especially for layout below the floor or platform and pipe) near a pillar, 。
CONTACT DETAILS
Phone: +86 13816377866
Email: jimmy011@126.com
Add:NO999, Sunqiao RD, Pudong area, Shanghai, China