A, install the location of the thermal resistor, should try to ensure the verticality, protecting tube to prevent thermal resistance appears because of the factors of high temperature deformation; Second, must choose a convenient site construction and maintenance, to install thermal resistance, and less vulnerable to the outside world any damage location; Three bare place, heat resistance, should try to be short on length, and is adding thermal insulation layer, the heat loss of the guarantee, and the measurement error; Four, if the medium to be measured, the phenomenon of the flow velocity, should ensure that its centerline in the pipeline, and measured the fluid flow in the direction is relative; Chapter five, the need to heat resistance by in the line, must be set up on the pipe outlet, and the connection between the socket and the pipe is strong, is the main material must be consistent.