9. Installed on the straight pipe and the bend it doesn't matter, if installed on the straight pipe is the most main attention should be paid to insert depth, installation to media attention to flow direction in turning, heat resistance and bimetallic thermometer connected to the flow direction of medium head to inverse the installation.
CONTACT DETAILS
Phone: +86 13816377866
Email: jimmy011@126.com
Add:NO999, Sunqiao RD, Pudong area, Shanghai, China