Installation steps: 1) Pen off the bus roots within 15 mm of insulation on marking; ( 2) Screw straight busbar protection pipe lining, ensure the bus incoming busbar protection pipe lining; ( 3) Into the bus protection tube, in low temperature environment, needs a little push, when the bus protection pipe lining is introduced, show that installed correctly; ( 4) Take bus protection pipe lining and stored in plastic bags; ( 5) The green/yellow casing set into the shielded wire, does not need to heat shrinkable processing; ( 6) Pull back with tropical, above 25 mm; ( 7) Glass pressure sensitive adhesive tape, twisting three times; ( 8) Installation of terminal point and base, make the terminal whorl 25 higher than that of electric tracing band. 4 mm, and then screw down the screws; ( 9) The base fixed on the pipe with clamp, and the extra electric tracing band tape winding on the pipeline; ( 10) The bus between the conductive fiber cut open and peel, cut and remove the insulation of the middle separator, and the bus bar is clean; ( 11) Bus and shielding metal net, through the terminal, respectively connected to the power cord and the bottom line, lifted the lid and put the wires in the box pack.
CONTACT DETAILS
Phone: +86 13816377866
Email: jimmy011@126.com
Add:NO999, Sunqiao RD, Pudong area, Shanghai, China