Expert Thermocouple & RTD &Temperature Sensor Manufacturer.

+86 13816377866    |    jimmy011@126.com

Thermocouple head

Precautions when installing stainless steel ducts

by:JVTIA     2022-01-05
Do you know what are the precautions for stainless steel duct installation? Let's take a look at it together! Hope to help everyone. 1. Surface glass fiber composite board glass wool board pipe insulation layer, so the required wind wall can reliably shield the outer surface layer of the fiber, because the air laminar flow of the pipe wall paint is in direct contact with the pipe, so the paint is harmless to the human body. 2. The glass fiber cloth tube of the surface protective layer should limit the basic components of the glass clay Farasil technology of miscellaneous components to ensure the strength and toughness of the glass fiber cloth. 3. Wind pipe installation requirements, use special tools to ensure notch formation and bile duct formation, the glass fiber composite board tube is slotted. The groove should be brushed with glue and feet evenly to ensure that the groove and the blocked groove tube are tightly bonded, firmly bonded, and glass fiber is not exposed. 4. Pipe corner flange or coat slotted flange connection, the flange has high bending strength, and the joint is commensurate with an outer pipe reinforcement frame. The length of the other connecting pipes of the wind pipe is longer at 1200mm. The strength of the connecting component is stronger than the strength of the outer reinforced frame. It is called for the male and female tenon connection with the distance between the joint and the steel frame not exceeding 150nnn. The wind wall resists the bending of the tenon part. Weak, Therefore, the distance between the tenon joint and the adjacent steel frame should not exceed 100mm. 5. Shield to prevent the scattered glass fiber and acrylic resin coating on the surface of the glass wool board from permeating and exuding, spray evenly, and do not allow leakage of coating defects. 6. The choice of glass fiber composite board duct reinforcement involves multi-variable side-length pipe static pressure duct, high-quality duct reinforced groove steel other than the simplified table 3.6.10 two specifications, easy-to-use slot box specifications . Large cross-section pipes can rely on adjusting the spacing and support points of steel bars to meet the reinforcement requirements of the air duct. 7. The pipe port has nourishing yin, and the male tenon pipe should be flat to prevent damage to the tongue and mouth. The notch adhesive adhesion must be kept dry. After curing, the pipe is firmly bonded to the bonding department to maintain a stable state. A place to store fiberglass composite board tubes should be protected from rain and wind.
Shanghai Jiutian Automation Equipment Co., Ltd has an array of branches in domestic for servicing customers with high-quality products.
The expert engineers of Shanghai Jiutian Automation Equipment Co., Ltd always develop with utmost precision so that all quality standards are met during the production. we are looking forward to becoming a trusted supplier of customers. visit us at Jiutian Temperature Products.
While temperature sensor manufacturers, RTD supplier temperature sensor can help achieve high accuracy._x000D_
We believe in keeping the customers happy and providing them with resistance temperature detector at a very competent price.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...